Net Metering in Pakistan: The New Net Billing Rules Explained Leave a comment

Net metering in Pakistan changed in February 2026. For ten years, it was the main reason rooftop solar paid for itself so quickly. However, if you are planning a system now, the old advice of filling the roof with panels no longer gives the best return.

This post explains what changed for net metering in Pakistan, who it affects and how to size a system under the new rules. NEPRA sets the rates and can revise them. Therefore, confirm the current figure with your electricity company before you sign anything.

What changed for net metering in Pakistan

On 9 February 2026, NEPRA notified the Prosumer Regulations 2026. As a result, a system called net billing replaced the 2015 net metering regulations.

Old net meteringNew net billing
How exports are valuedOne exported unit cancelled one imported unitExports are bought at the national average energy purchase price
Reported buyback rateAbout Rs 26 to 27 per unitAbout Rs 10 to 11 per unit
What you pay for grid unitsYour normal tariffYour normal tariff
Agreement termSeven yearsFive years
Who pays for meter and connection—The solar owner

In addition, NEPRA has kept the right to revise the purchase rate. Therefore, the buyback figure can change during the life of an agreement.

If you already have net metering

Existing net metering customers in Pakistan keep their terms, because the rules protect agreements signed before 9 February 2026. After public objections, NEPRA amended the regulations, so existing approvals and agreements stay valid on their original terms until they expire. If you are in this group, check the expiry date on your agreement, because the new terms apply after that.

Also, take care before adding panels to an existing system. First, ask your electricity company in writing whether the change affects your current agreement.

What net billing means for your bill

Under net billing, which replaced net metering in Pakistan, two things have very different values:

  • A unit you use yourself saves you the full price of a grid unit.
  • A unit you export earns only the buyback rate.

For example, at a tariff of Rs 50 per unit and a buyback rate of Rs 11, a unit you use at home is worth more than four times a unit you send to the grid. Therefore, the system that pays back fastest matches what you use, rather than the largest one your roof can hold.

How to size a system under net billing

  1. Start from your daytime use. ACs, pumps, washing and ironing that run while the sun is up use solar directly at full value.
  2. Move load into the day. For example, run the washing machine, water pump and geyser between mid-morning and mid-afternoon.
  3. Add a battery for the evening. A battery stores cheap midday solar and then gives it back after sunset, when you would otherwise buy grid units at the full tariff.
  4. Treat exports as a bonus. In other words, do not add panels only to sell units.

For this reason, hybrid inverters with lithium batteries have become the usual choice for new home systems. For example, the SAJ 6kW hybrid inverter pairs well with a 48 V battery from our Dyness lithium battery guide.

How to apply for net billing in Pakistan

Applications go through your distribution company, or K-Electric in Karachi. In outline:

  1. First, install the system with an inverter that supports grid export.
  2. Then your installer submits the application with the system drawings and equipment details.
  3. After that, the electricity company inspects the installation.
  4. Finally, the company fits a bidirectional meter and you sign the agreement.

Requirements and fees differ between companies and change from time to time. Therefore, ask your company for its current checklist before buying equipment, so that the inverter you choose is on its approved list.

Is solar still worth it?

Yes, although the reason has changed. Since net metering in Pakistan ended for new connections, the saving comes mainly from the grid units you no longer buy. A system that matches your own use, with a battery to cover the evening, still removes most of a household bill. In contrast, a system oversized for exports takes much longer to pay back than it used to.

For panel choice, see our Jinko Tiger Neo guide.

Common questions

Can I install solar without applying for net billing?

Yes. Like net metering in Pakistan before it, net billing is optional. A hybrid or off-grid system that does not export needs no agreement. Instead, you simply use what you generate and store.

Do I lose my old net metering rate if I move house?

The agreement belongs to a connection, not a person. Therefore, ask your electricity company how it handles a change of ownership before you buy or sell.

Will the buyback rate change again?

It can, because the rate follows the national average energy purchase price, which NEPRA revises. So size your system so that it makes sense even if exports earn very little.

Leave a Reply

Your email address will not be published. Required fields are marked *